Independent renovation guide for Canada

RénoClair

Multi-Room Renovation Budget Planner

Add up several renovation projects, include a contingency reserve and your province’s sales tax, and get a payment schedule with a completion holdback.

Updated November 15, 2026. Amounts come from the RenoClair calculators; payment rules checked against provincial law.

Redoing the kitchen, a bathroom and the floors in the same year? This planner adds up the projects you pick, adds a contingency reserve based on your home’s age, applies your province’s sales tax and suggests a payment schedule with a completion holdback. Example: kitchen, bathroom, flooring and painting in Quebec = about $70,150 before tax ($55,400 to $91,500).

Multi-project budget and payment planner

Build your whole-home renovation budget & milestone payment schedule

Pick your province, the age of your home, the finish level and the projects to combine. The planner adds up the budget, the contingency reserve, sales tax and a payment schedule with holdback schedule.

Amounts are the typical before-tax reference cases of each RenoClair calculator for the selected province. Open “Detailed calc” to adjust size, materials and options.

4. Check the projects to include in your plan:

20 lin. ft of cabinets, mid-range · Detailed calc →
60 sq ft, mid-range · Detailed calc →
800 sq ft, standard finish · Detailed calc →
500 sq ft, SPC vinyl · Detailed calc →
900 sq ft, walls and ceilings · Detailed calc →
1,400 sq ft footprint, shingles · Detailed calc →
10 PVC windows, full-frame · Detailed calc →
1,500 sq ft, vinyl · Detailed calc →
120 lin. ft, membrane + drain · Detailed calc →
2-head ductless, 24,000 BTU/h · Detailed calc →
1,000 sq ft to R-50 · Detailed calc →
100A → 200A service · Detailed calc →
8 kW, shingle roof · Detailed calc →
48A hardwired charger, under 15 ft · Detailed calc →
240 sq ft pressure-treated, railing and piles · Detailed calc →
600 sq ft asphalt, excavation included · Detailed calc →
120 lin. ft pressure-treated + gate · Detailed calc →
Works Subtotal (Before Tax)
—
—
Recommended Contingency
—
—
Total With Taxes & Reserve
—
—
Holdback to retain
—
—
Materials vs. Skilled Labour:
Home Age Technical Watchpoints:
Energy rebates:

Suggested milestone payment schedule and holdback by province

Milestone StageShareAmount (Incl. Tax)Verification Condition Before Paying

Get this plan as a PDF by email

Reference budgets for 4 combined projects by province

Each amount is the sum of the typical before-tax reference cases of the RenoClair calculators for that province (range below). Sizes: kitchen 20 lin. ft mid-range, bathroom 60 sq ft mid-range, 500 sq ft SPC flooring, 900 sq ft of walls and ceilings, 1,400 sq ft shingle roof, 10 PVC windows, attic 1,000 sq ft to R-50, 2-head heat pump, 120 lin. ft of weeping tile, 800 sq ft standard basement, 240 sq ft pressure-treated deck, 600 sq ft asphalt driveway, 120 lin. ft fence with gate.

Combined projectQuebecOntarioBritish ColumbiaAlberta
Interior refresh
kitchen, bathroom, flooring, painting
,150
,400 – ,500
,250
,450 – 2,800
,500
,900 – 3,600
,100
,250 – 2,750
Envelope and energy
roof, windows, attic, heat pump
,700
,950 – ,500
,600
,500 – ,300
,300
,150 – ,850
,400
,000 – ,150
Dry, finished basement
weeping tile, basement finishing
,800
,000 – 0,000
,600
,600 – 1,200
,400
,200 – 9,600
,600
,000 – 0,800
Yard and outdoor
deck, driveway, fence
,050
,000 – ,950
,000
,350 – ,650
,950
,000 – ,300
,500
,250 – ,950

In what order should you renovate?

  • Protect the house first: foundation and drainage, roof, then windows. A basement finished over a leaking foundation gets torn out.
  • Then what goes inside the walls: electrical (200A panel), plumbing and insulation before drywall is closed.
  • Then finishes: kitchen, bathroom, flooring, and painting last.
  • Outdoor work last: driveway and fence after the heavy work, so equipment doesn’t damage the new surface.

Completion holdback by province

A holdback is part of the price you keep until a waiting period ends, so an unpaid subcontractor or supplier can’t register a lien or hypothec against your home.

ProvinceHoldbackPeriodLaw
QuebecNo mandatory statutory holdback; 10% is a prudent contract practiceUntil 30 days after the end of work, plus signed releasesConstruction legal hypothec, Civil Code arts. 2726 and 2727
Ontario10% mandatory60 days after completion or publication of the certificate of substantial performanceConstruction Act
British Columbia10% mandatory55 days after completionBuilders Lien Act
Alberta10% mandatory60 days (90 days for some concrete work)Prompt Payment and Construction Lien Act

To track price increases in your city, see renovation costs by city. Taxes are shown separately: 14.975% GST + QST in Quebec, 13% HST in Ontario, and 5% GST in British Columbia and Alberta. In BC, the contractor pays the 7% PST on materials and includes it in the price for work that becomes part of the house. For change orders and the reserve in detail, use the contingency, change order and holdback calculator.

What this planner does not do

  • Amounts are before-tax benchmarks, not a quote.
  • Each project uses one reference size; open its calculator to match your home.
  • Rebates are not added automatically because their rules change often. See the tools list, which includes the rebate calculators.

Frequently asked questions

How much does a multi-room renovation cost?

For a kitchen, a bathroom, 500 sq ft of flooring and painting plan about $70,150 before tax in Quebec ($55,400 to $91,500), $86,250 in Ontario, $94,500 in British Columbia and $86,100 in Alberta, plus a 10% to 20% contingency depending on the home’s age.

How much contingency should I plan?

About 10% for a newer home and simple work, 12% once three projects are combined, plus a few points for a 1960–1989 home (+2) or a pre-1960 home (+5), where opening walls more often reveals surprises.

Is there a statutory holdback in Quebec?

No. Unlike Ontario, B.C. and Alberta, Quebec does not require one. Subcontractors and suppliers who declared their contract to the owner can still publish a legal hypothec up to 30 days after the end of work, so keeping about 10% until then and asking for signed releases is a common precaution.

How big should the deposit be?

A 10% deposit at signing is a prudent practice. A larger one is only justified for custom products ordered right away, such as cabinets or windows.

Should I do all the work at once?

Grouping work saves trips and avoids undoing finished work, but needs more money up front. What matters most is the order: envelope, then systems, then finishes.