Compare your quotes on equal terms, check a contractor’s licence, insurance and clearances in official registries, and follow the right order of work.

Updated November 22, 2026. Links checked against each province’s official registries.

Before you sign, check 3 things: the contractor’s licence, their insurance and their workers’ compensation coverage. Then compare at least 3 quotes on the same basis, pay a deposit of no more than 10% and tie each payment to progress. The comparison tool below puts your quotes on equal terms and flags what is missing.

Compare your quotes on equal terms

If a quote includes an allowance (amount set aside for cabinets, tile, fixtures…), the tool replaces it with this amount so quotes compare on equal terms.

Quote 1

Quote 2

Quote 3

Where to check a contractor, province by province

ProvinceWhat to checkOfficial registry
QuebecRégie du bâtiment licence (category that covers the work)RBQ: check a licence
QuebecItinerant merchant permit (doors, windows, insulation, roofing or siding sold at home) and historyOffice de la protection du consommateur
OntarioElectrician licensed by ESA (Licensed Electrical Contractor)ESA: find a contractor
OntarioWSIB clearance certificateWSIB: clearances
OntarioYour rights: written contract, 10-day cooling-off periodOntario.ca
British ColumbiaElectrical or gas contractor licenceTechnical Safety BC
British ColumbiaClearance letterWorkSafeBC
AlbertaPrepaid Contracting licence if a deposit is taken before the work is finishedService Alberta: licence
AlbertaWCB clearance letterWCB Alberta

What the quote and contract must include

  • Contractor’s name, address and licence number, and insurance policy number.
  • Detailed description of the work and materials (brand, model, quantity), including allowances.
  • Total price, taxes, payment schedule and deposit amount.
  • Start and end dates, cleanup and debris removal.
  • Written warranty, and who gets and pays for the permit.
  • A clause requiring your written approval before any extra work (change order).

In Ontario, when an estimate is part of the contract, the final price cannot exceed it by more than 10% without your written agreement. In Quebec, the Office de la protection du consommateur recommends avoiding a deposit or keeping it very small, and holding back 10% to 15% until the work is finished. Calculate your holdback with the contingency and holdback calculator.

The order of work and inspections

  • 1. Permit and plans: before any demolition.
  • 2. Demolition: and testing of materials that may contain asbestos in older homes.
  • 3. Structure: openings, beams, floors.
  • 4. Plumbing, electrical, ventilation rough-in: inspection before walls are closed.
  • 5. Insulation and vapour barrier: inspection or photos before drywall.
  • 6. Drywall, taping and primer.
  • 7. Cabinets, flooring, tile, finishes.
  • 8. Final inspection and deficiency list: before the last payment and holdback release.

Never pay for the next stage if the previous stage’s inspection has not happened. To price the project, use the multi-room budget planner or our cost calculators.

Frequently asked questions

How do I check a contractor’s licence in Ontario?

Ontario has no general renovation licence, but electrical work must be done by an ESA Licensed Electrical Contractor and gas work by a TSSA-registered contractor. Ask for a WSIB clearance certificate, and check whether your city, such as Toronto, licenses renovators.

How big a deposit should I pay a contractor?

Ontario recommends a maximum of 10%. In Quebec, the Office de la protection du consommateur recommends avoiding a deposit or keeping it very small. A larger deposit is only justified for custom-made products.

How many quotes should I get?

At least 3, using the same plan and materials list, so you can compare them on equal terms.

What is an allowance in a quote?

An amount set aside for an item not yet chosen, such as cabinets or tile. A low allowance makes a quote look cheaper than it is: compare with your expected real cost.

Can I cancel a renovation contract signed at home?

In Ontario, a contract of $50 or more signed at home can be cancelled within 10 days. In Quebec, the 10-day period applies to contracts with an itinerant merchant.